This is the plot plan for the existing Vasquez High School site! It shows a proposed 10 acre add on that is not part of the property. Most of the land on the east along Red Rover, Escondido Canyon Road and the tip of the triangle on the west end is Flood Way or Flood Plain and is un-buildable. All of the property carries a restricted use designation because of sheet flow flooding.
This site is so small that when a permanent school is built the existing temporary structures have to be moved to the playing fields and their pads and wiring demolished and scrapped.
Playing fields must be destroyed and regraded for the new concrete pads and wiring, then the modulars moved to the new pads on the site of the old fields.
When the permanent school is built, all the new pads must be removed and the playing fields rebuilt.
All at a waste approaching $2 million for absolutely nothing! And, after several million dollars has been spent setting up the modular structures in the first place.
Acton
Agua Dulce School District Data
Acton
Agua Dulce School District
Vanguard News Home page